acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/owsfireratedcouk_861/public/web/wp/wp-includes/functions.php on line 6121Clients
Skanska
Architect
Fletcher Priest Architects and Sauerbruch Hutton
One New Ludgate Hill
E60 Integrity Only Fire Rated Doors and Screens
Completed in 2015, 1 and 2 New Ludgate is a development of two office buildings of 157,917 sq ft and 198,630 sq ft, and 28,524 sq ft of retail. Both buildings have distinctive designs and roof terraces with great views of St Paul’s Cathedral.
Showcasing a modern architectural design by Fletcher Priest Architects and Sauerbruch Hutton, the new building complements its historical surroundings, particularly the Cathedral precinct.
To ensure the highest levels of safety, Skanska approached Pyrostyle to install 12 fire rated doors across Levels 3-5 in One New Ludgate Hill. The doors are E60 Integrity in accordance with BSEN 1634-1:2014 and feature a combination of single and double-leaf doors with side screens.
Pyrostyles fire rated doors are designed to provide exceptional safety and protection, ensuring that the occupants of the building can work with complete peace of mind.
One New Ludgate Hill